GROVE GMK 5220 PDF

Crane Specification search result for manufacturer: Grove and model: GMK Grúa Todo Terreno Rapida • Gru Fuoristrada Veloci. GMK product guide. t. 68 m. 12 – 37 m. m. N GROVE (MULTI) 24/10/06 Introduced in , the Grove t (metric) GMK (GMK in the USA) has been in production since It has a 68 m 7-section main boom and a jib.

Author: Dogor Tojall
Country: Cyprus
Language: English (Spanish)
Genre: Health and Food
Published (Last): 22 April 2008
Pages: 141
PDF File Size: 18.87 Mb
ePub File Size: 17.16 Mb
ISBN: 652-9-94875-297-1
Downloads: 72973
Price: Free* [*Free Regsitration Required]
Uploader: Nikokasa

Andy Gagarin, project manager with Ohms-Psi Construction Trading, said the smoothness of the installation process prompted some celebrations on the project. Ravago recommended the crane not only because it had the strength, reach and maneuverability to make the lifts, but also because it was fast enough to complete the job inside a day.

The crane is also relatively narrow, with a 3 m width, and at the Far Eastern University site that was a plus. Reach can be extended to up to m through the addition of jib attachments.

  BRENTON BROWN JOYFUL PDF

Grove GMK Specifications CraneMarket

AsiaE calculated that the installation of the new aircon system would require three lifts, each of 14 t, to install the chiller plus another lift to position the 3 t of additional accessories, all of which would be lifted to the top of the building.

Subscribe to the latest Manitowoc news.

The contractors in questions were, Ravago Equipment Rentals Inc. Download Image Hi-res Low-res.

However, the roads surrounding the building were so narrow that even though the GMK was compact enough to access the lift site, in order to extend its outriggers AsiaE had to get special permission from the local council to dismantle some barriers.

The five-axle Grove GMK has a t maximum capacity and a 68 m main boom. AsiaE was the logistics and delivery contractor, while Ravago, which is a multi-discipline industrial company, supplied the crane from its large rental fleet — one of the biggest in The Philippines. Although 7 hours were initially allocated for the work, in the end the whole project was wrapped up in just 4 hours. An on-site audience was also in attendance, as senior engineering students from the university were invited to watch the installation work.

  HUMAN SYNERGISTICS CIRCUMPLEX PDF

Grove GMK gets to Play at first job in Germany

Manitowoc Direct Login Request Access. On the day there were over 30 people from both Ravago and AsiaE working on the set up for the technical set of lifts.

One by one, each lift was completed and all went exactly to plan, with no damage to any surrounding object despite the highly congested working area.

The crane operator set the lifting parameters in accordance with the engineering plans and the three lifting points for the chiller and accessories were set.

Founded inThe Manitowoc Company, Inc. grve