Fill aia a form aia instantly, download blank or editable online. Sign, fax and printable from PC, iPad, tablet or mobile. No software. Try Now!. “standard” American Institute of Architects (AIA) documents. A (by incorporation of the A) and A do not provide for any specified damages. AIA Document A – TM Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope AGREEMENT made as of the.

Author: Tulabar Kazilkis
Country: Suriname
Language: English (Spanish)
Genre: Life
Published (Last): 1 June 2009
Pages: 10
PDF File Size: 4.68 Mb
ePub File Size: 6.66 Mb
ISBN: 495-3-19668-595-9
Downloads: 27231
Price: Free* [*Free Regsitration Required]
Uploader: Mazucage

The Contractor further warrants that the Work will conform to the requirements of the Contract Documents and will be free from defects. Analogously, the expression “reasonably inferable” and similar terms in the Contract Documents shall be interpreted to mean reasonably inferable by a contractor familiar with the Project in exercising the care, skill and diligence required of the Contractor herein.

Either list the Drawings here or refer to an exhibit attached to this Agreement. Statutory amount; Coverage B: Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion.

The Owner, without invalidating the Contract, may order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, with the Contract Sum and Contract Time being adjusted accordingly. Public Works Contractor Registration Certification.

Insert number of calendar days.

The issuance of a Certificate for Payment will further constitute a representation that the Contractor is entitled to payment in the amount certified. The Owner shall only bear costs of 1 tests, inspections or approvals that do not become requirements until after bids are received or negotiations concluded, and 2 tests, ai or approvals where building aiia or applicable Laws or dkcument prohibit the Owner from delegating the costs to the Contractor.

The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contractor shall comply with and give notices required by applicable Laws bearing on safety of persons and property and their protection from damage, injury or loss.

This draft was produced by AIA software at The Contractor shall, by appropriate agreement with each Subcontractor, require each Subcontractor to make payments to sub-subcontractors in similar manner.

Copyright Law and International Treaties. The Contractor hereby specifically acknowledges and declares that the Contract Documents are sufficient to have enabled the Contractor to determine the cost of the Work therein in order to enter into the Contract and that the Drawings, Specifications, and all Addenda, are sufficient to enable it to construct the Work outlined therein.

  16F886 DATASHEET PDF

Contractor shall indemnify, hold harmless and, if requested by Owner in its sole and absolute discretion, defend with counsel approved by Owner the Indemnified Parties from and against any and all Losses, including, without limitation, Losses associated with bodily injury, property damage, or the removal of any products and restoration of the site, to the extent arising out aix a breach of any documeny, representation and warranty set forth in this Section Owner shall include in its hazard policy covering the Project, the personal property, fixtures and equipment located thereon owned by Ownerappropriate clauses pursuant to which the insurance carriers shall waive the rights of subrogation with respect to losses payable under such policies.

In addition to the requirements in section An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. The one-year period for correction of Work shall be extended with respect to portions of Work first performed after Substantial Completion by the period of time between Substantial Completion and the actual completion of that portion of the Work.

All copies made under this authorization shall bear the copyright notice, if any, shown on the Instruments a1007 Service.

AIA A – – Clean ()

The Contractor shall execute all consents reasonably required to facilitate such assignment. If requested, the Contractor shall provide copies of all bids, bid letters, and executed subcontracts to Owner within ten 10 days after execution thereof.

The Contract may be amended or modified only by a Modification. Consultation with an attorney is encouraged with respect to its completion or modification. Notwithstanding anything to the contrary contained in the Contract Documents, the Owner may withhold any payment to the Contractor hereunder if and for so long as the Contractor fails to perform any of its obligations dovument or otherwise is aaia default under any of the Contract Documents; provided, however, that any such holdback shall be limited to an amount sufficient in the reasonable opinion of the Owner to cure any such default or failure of performance by the Contractor.

Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an docunent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall, except as otherwise set forth below, bear all related costs of tests, inspections and approvals.

  EL GRITO PRIMAL PDF

Consent shall not be unreasonably withheld. The Work shall be in accordance with approved submittals.

AIA A107 – 8-27 – Clean (01480188-2)

If approved in advance by the Owner, payment may similarly be made for materials and equipment stored, and protected from damage, off the site at a location agreed upon in writing. Identify and state the unit price, and state the quantity limitations, if any, to which the unit price will be applicable. Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work.

The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to. The Contractor, Subcontractors, Sub-subcontractors, and material or equipment suppliers shall not own or claim a copyright in the Instruments of Service. The Owner shall not be deemed to be in default by reason of withholding payment while any of the above reasons for withholding certification remain uncured.

Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.

The Contractor shall promptly remedy damage and loss to property caused in whole or in part by the Contractor, a Subcontractor, docunent sub-subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable a1077 for which the Contractor is responsible under Sections Check the appropriate box. Owner shall save Contractor harmless from any liability on account of loss, damage, or injury, to the extent actually insured against a1007 Owner provided: Insert the date of commencement, if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.

The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.

By executing the Agreement the Contractor confirms that the Contract Time is a reasonable period for performing the Work. The Owner shall select materials and equipment under allowances with reasonable promptness.